Monthly Archives: September 2016

Mcnulty’s comes down

Shields Gazette 16 Sept 2016 by Fiona Thompson Email: They once helped make the banks of the River Tyne a hive of industrial activity. Now, the sheds of McNulty Offshore are being pulled down as the next chapter in the … Continue reading

Posted in Uncategorized | Leave a comment

Closure of Tyne Dock

The bonfire of insanity: Woodland is shipped 3,800 miles and burned in Drax power station. It belches out more CO2 than coal at a huge cost YOU pay for… and all for a cleaner, greener Britain! Drax Power Station in … Continue reading

Posted in Port of Tyne | Leave a comment

Closure of Tyne Dock

Mcnultys no More Shields Gazette 16 Sept 2016 by Fiona Thompson Email They once helped make the banks of the River Tyne a hive of industrial activity. Now, the sheds of McNulty Offshore are being pulled down as the next … Continue reading

Posted in Port of Tyne | Leave a comment

248789 Disappears out of sight.

The Complaint raised on 10-Jan-14  can easily be summarised as: Approved drawing 8296/14 show that the enclosure or shed is 2.7m taller and nearly a meter wider than planned than the measurements taken in the September before thus not meeting … Continue reading

Posted in Planning, UK Docks | Leave a comment

Mail to Hayley Johnson 02-Sep-16

At the heart of my letter to the Chief Executive is the Observation on the original complaint 248789: I ask you to look again at this because there is a clear contradiction between what the Council were telling the LGO … Continue reading

Posted in Abuse of Complaints System, Corruption, LGO, Misinformation/Misrepresentation | Leave a comment

1st Misrepresentation

is in the Subject: From: Principal Planning Officer To: Greens Place Resident CC: 7 Local Residents;  cllr.john.anglin@southtyneside.gov.uk; cllr.audrey.mcmillan@southtyneside.gov.uk; Cllr.John.Wood@southtyneside.gov.uk; Mike.Telford@southtyneside.gov.uk; Gordon.Atkinson@southtyneside.gov.uk Date: Mon, 9 Sep 2013 13:08:28 +0100 Subject:  Approved boat repair shelter at Tyne Slipway, River Drive, South Shields … Continue reading

Posted in Planning, UK Docks | 1 Comment

Classic Back Pass

One of the best examples of abuse of the Council’s Complaints Procedure. The equivalent of a Stage 3 level of complaint passed back to Stage 2 level. Michaela was no longer in post in Customer Advocates and I believe this … Continue reading

Posted in Misconduct | Leave a comment

Hypocrisy

Greens Place South Shields NE33 2AQ Ref: 248789 2nd September 2016 Dear Ms Johnson South Tyneside Council and the Local Government Ombudsman Thank you for your letter of the 1-Aug-2016 in response to my letter to the Chief Executive on … Continue reading

Posted in Abuse of Complaints System, LGO, Misconduct, Misinformation/Misrepresentation, MP, South Tyneside Council, UK Docks | Leave a comment