A further inspection – 15-Jan-14

Email 15th January 2014. from the Planning Manager.

1 – [6] A further inspection on 22nd May 2001 showed that the foundations were fully concreted.
A meter wider than the plans allowed. It so happens that a 5 ton travelling crane fits the new frames exactly when hoisted into place some 13 years later.  The frame sides are not to plan either, they are vertical which adds an extra three meters.
The internal width of the shelter at the height of the crane is now of the order of 11.5m where it was 7.5m. This is over half as much again. This a non-material deviation according to the planning office.