Author Archives: moderator

Prologue to Shed and Corruption

12-October-2022* In the covering email to a former neighbour, I implied that some of my neighbours were unreliable witnesses and gave some evidence, some of which may be disputed, though I can vouch for the fact the Haigs did tell … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Evasion | 2 Comments

Commentary on Shed and Corruption – Part 17

Email to MP, 20-Jul-22: Shed and Corruption – Part 17: Messrs Buck and Palmer Attachment: UKD-Slipway-Enclosure.pdf, dated 3-Aug It became obvious a couple of minutes into the phone call requested by Mr Palmer in January 2020, that it was set … Continue reading

Posted in Abuse of Complaints System, Corruption, Evasion, South Tyneside Council, UK Docks | 1 Comment

Critique of Legal Monitoring Officer – 2018

Introduction to the Critique A much simpler version of this critique was published 2 years ago. The local residents guessed from the first week in September 2013, that UK Docks had built their shed taller than permitted because the planning … Continue reading

Posted in Abuse of Complaints System, Denial, Evasion | Leave a comment

Shed and Corruption – Part 18

I had intended to write to my MP, Anne-Marie Trevelyan, on the Opening of Parliament about UK Docks’ shed in South Shields but events overtook me and it was not sent until September. Those events were well reported so there … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial | Leave a comment

Shed and Corruption – Messrs Buck and Palmer

Shed and Corruption – Part 18 From: mick.dawson@theharbourview.co.uk Date: 04/08/2022 (11:59:17 BST) To: Melanie Todd Cc: Emma Lewell-Buck MP, Anne-Marie Trevelyan MP, Monitoring Officer, Alison Hoy 1 Attachment: UKD Slipway Enclosure.pdf (68 KB) Hi Melanie, Please see, UKD Slipway Enclosure. … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial | Leave a comment

Shed and Corruption – Part 17

Shed and Corruption – Part 17 – Messrs Buck and Palmer From: mick.dawson@theharbourview.co.uk Date: 20/07/2022 (17:20:25 BST) To: Emma Lewell-Buck MP 1 Attachment: EmmaLB20-Jul-22.pdf (Messrs Buck and Palmer) Dear Emma, I’ll try and be brief, please see the attached file … Continue reading

Posted in Corruption, Misconduct | Leave a comment

Exhausted Complaints Procedures – Part 16

Covering Email:- Shed and Corruption – Part 16 From: mick.dawson@theharbourview.co.uk Date: 08/07/2022 (17:19:49 BST) To: Helen Dalby Cc: Emma Lewell-Buck MP, Anne-Marie Trevelyan MP, Jonathan Tew, George Mansbridge, Alison Hoy 1 Attachment:- Exhausted Complaints Procedures.pdf Dear Ms Dalby, I have … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Evasion, South Tyneside Council | 2 Comments

Shed and Corruption – Part 8: Misusing CA to Misinform

Our protest that UK Docks’ shed built 3m taller than planned was killed off by Ms Hamilton on the 24th November 2014 when she wrote and told me:- “I can confirm that as previously advised, the Council accepts that the … Continue reading

Posted in Abuse of Complaints System, Corruption, Misconduct | Leave a comment

The Shed: Approved Height v Built Height

UK Docks were allowed to build, without planning permission by South Tyneside Council (STC), a shelter on their slipway on the banks of the Tyne in South Shields. In spite of protests from the first days, that it was bigger … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Evasion | Leave a comment

Review of the Shed and Corruption Series

Pdf copy of Review Redhead’s Landing, Templetown, South Shields On May 7th 2013 South Tyneside Council (STC) gave the slipway known as Readheads Landing to the Port of Tyne because they could, and that spelled the death knell of the … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Evasion | 1 Comment