Author Archives: moderator

Palmer and Co

When I talked with Mr Palmer on the afternoon of the 13th January,  I assumed that I was talking with new manager of the MP’s Office in South Shields because the phone number given was that of the MP’s Office. … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Misconduct | Leave a comment

Shed and Corruption – Part 11: Shooting the Messenger in 2015

The neighbours of UK Docks’ slipway shed off River Drive complained about its height in September 2013 and after the Council’s Planning Manager conceded that it was too tall, some five months later, we asked for it to be removed … Continue reading

Posted in Abuse of Complaints System, Corruption, South Tyneside Council | 2 Comments

Scaled or Not?

Approved Drawing 8296/4. A copy is held on theharbourview.co.uk as D8296_4.pdf Is is best to view on a laptop or big tablet as the scale can be adjusted to represent an A4 page at 1:1 (make the width on the … Continue reading

Posted in Information/Evidence, Misinformation/Misrepresentation | Leave a comment

Disappearing Footpaths

When Garlands applied to South Tyneside Council for permission to build their Call Center they anticipated a workforce of about 800 and permission was granted for two office buildings and a large overspill car park:- Garlands is delighted to announce … Continue reading

Posted in Abuse of Complaints System, Corruption, South Tyneside Council | Leave a comment

Evasions

Methods employed by South Tyneside Council in evading an observation or complaint and in the example used the slipway company, had flouted one of the conditions of the original grant – that it be built to an approved set of … Continue reading

Posted in Abuse of Complaints System, Corruption, South Tyneside Council | Leave a comment

STC and the Local Government Ombudsman

From: Michael Dawson <daw50nmdj@hotmail.co.uk> Sent: 05 January 2021 08:31 To: Emma Lewell-Buck MP <emma.lewell-buck.mp@parliament.uk> Cc: Nicola Robason <Nicola.Robason@southtyneside.gov.uk>; John Rumney <John.Rumney@southtynside.gov.uk>; Alison Hoy <Alison.Hoy@southtyneside.gov.uk>; mick.dawson@theharbourview.co.uk There were no rejections or out of office replies from anyone. Dear Emma STC and … Continue reading

Posted in Abuse of Complaints System, Corruption, UK Docks | Leave a comment

Shed and Corruption – Part 10: How UK Docks got their Longer Shed

Shed and Corruption – Part 10 From: mick.dawson@theharbourview.co.uk Date: 30/12/2021 (17:05:36 GMT) To: Jonathan Tew Cc: Anne-Marie Trevelyan MP, Emma Lewell-Buck MP, George Mansbridge, Garry Simmonette, Alison Hoy, Nicola Robason Attachment: SandC-Part-10.pdf Dear Mr Tew, I hope this email finds … Continue reading

Posted in Abuse of Complaints System, Corruption | 1 Comment

Broken Promise 2

Nichola, The attached documents are just to bring you and Paula up to date with where I’m at with both UK Docks’ Shed and the loss of the English Coastal Path. It looks like, until it is made a criminal … Continue reading

Posted in Abuse of Complaints System, Corruption | Leave a comment

Corrections to a Cautionary Tale

Broken Promise From: mick.dawson@theharbourview.co.uk Date: 04/11/2021 (09:14:40 GMT) To: Nicola Robason Cc: friendsofmarketdockpath@gmail.com, Paula Abbott, Alison Hoy, Anne-Marie Trevelyan MP, Emma Lewell-Buck MP Bcc: +20 Others 2 Attachments Broken Promise.pdf (68 KB) Corrections to the Cautionary Tale.pdf (78 KB) Corrections … Continue reading

Posted in Abuse of Complaints System, Corruption | Leave a comment

UKD Sundays

UKDocks – Sunday Working The Second Condition states: The development to which this permission relates shall be carried out in complete accordance with the approved plans and specifications. The basic reason for the existence of the Website the harbourview.co.uk is … Continue reading

Posted in Abuse of Complaints System, Corruption, UK Docks | Leave a comment