Author Archives: moderator

ST/1146/13

Details Page for Planning Application – ST/1146/13/COND Site Address Tyne Slipway & Engineering Co Ltd And Harry Wilson Associates River Drive South Shields NE33 1LH Application Progress Summary Application Registered 08-10-2013 Comments Until 07-10-2013 Date of Committee Decision Approve Details … Continue reading

Posted in Misconduct, Planning, UK Docks | 2 Comments

View of shed end – September 2013

One can work out that the shed is taller than planned because the drawings provided by the Council show both ends of the shed to be the same and the uphill one is wrong. The gradient is nearly 3 meters. … Continue reading

Posted in Planning | Leave a comment

Approved Drawing 8296/14

This was approved by the Planning Manager on 14th October 2013, ST114613COND Decision Notice.pdf, and the height and width can be gauged by scaling using the portal columns and roof beam. The gable end is drawn to a scale of … Continue reading

Posted in Planning | 8 Comments

To Councillor 27-Feb-19

—————————- Original Message —————————- Subject: Re: UK Docks / Harbour View Residents Concerns From: mick.dawson@theharbourview.co.uk Date: Wed, February 27, 2019 11:17 am To: “Cllr Angela Hamilton” Cc: “Mick Dawson” “Emma Lewell-Buck” “Planned Height of Shed” Dear Angela, Sorry about the … Continue reading

Posted in Uncategorized | Leave a comment

LGO Findings paras 30-38

or how the inspector was misled. PDF copy for download. The width is dealt with in paragraphs 19-23. The error – for 12.5m read 9.8m. 30. Mr X says the shed is also 3 metres higher than shown in the … Continue reading

Posted in LGO, Misinformation/Misrepresentation | 1 Comment

LGO Findings paras 19-23

The complaint to the LGO was very simple: the Case officer said the cover was compliant when it was not. It was built nearly a meter too wide and 3m too tall – see LGO Findings paras 30-38 about the … Continue reading

Posted in LGO, Misinformation/Misrepresentation | Leave a comment

All the Emails

The Council’s Solicitor in an email to Egress of 12-Dec-18 (decoded 14-Dec-18) provided a list of emails that I had written giving some background to my complaint about Councillor Anglin. She said “I refer to your emails dated 19 September, … Continue reading

Posted in LGO, Misconduct, Misinformation/Misrepresentation, MP, UK Docks | Leave a comment

Cllr A: The Wrong End

In the Planning Manager’s reply to my email of 24th Jan 2014 I felt that the Planning Office were ‘Stone Walling’ again by trying to sideline me into the complaints system instead of replying to my enquiries. The Principal Planning … Continue reading

Posted in Abuse of Complaints System, Misinformation/Misrepresentation | 1 Comment

CLLR A: The Emails

The Council’s Solicitor in an email of 14-Dec-18 provided a list of emails that I had written giving some background to my complaint about Councillor Anglin. She said “I refer to your emails dated 19 September, 1, 12, 15, 22 … Continue reading

Posted in Abuse of Complaints System, LGO, Misconduct, Misinformation/Misrepresentation | Leave a comment

STC and the Local Government Ombudsman

From: Michael Dawson <daw50nmdj@hotmail.co.uk> Sent: 05 January 2021 08:31 To: Emma Lewell-Buck MP <emma.lewell-buck.mp@parliament.uk> Cc: Nicola Robason; John Rumney; Alison Hoy; mick.dawson@theharbourview.co.uk Subject: STC and the Local Government Dear Emma, The zipped files are for reference; to back up what … Continue reading

Posted in Uncategorized | Leave a comment