Author Archives: moderator

Slipway Shed and Corruption – Dead End

From: Michael Dawson <daw50nmdj@hotmail.co.uk> Sent: 27 May 2017 07:43 To: ATKINSON, Rebecca Cc: Emily J Knight Subject: Boat Repair Shelter, Tyne Slipway (Uk Docks) Dear Rebecca, I have attached a copy of my letter which I delivered to the Chief … Continue reading

Posted in Abuse of Complaints System, Corruption, Denial, Evasion | Leave a comment

Conduct of Complaints Manager

26 May 2017 Dear Mr Swales This letter is about the conduct of your Corporate Lead, in respect of her letter to the MP for Berwick. I consider that she misrepresented the drawings I spoke about in making references to … Continue reading

Posted in LGO, Planning | 2 Comments

Misinterpretation of plans by STC 2

Dear Paul, Thank you for the feed-back. Someone also said to me, just accept the fact that the shed has been built too high and move on, get people interested in what is going to happen now. My point is … Continue reading

Posted in Planning, UK Docks | Leave a comment

Dear Mr Lewis, LGO

Dear Mr Lewis, Complaint against South Tyneside Metropolitan Borough Council Thank you for responding. My records show that your Inspector, Adele Reynolds, sent her final draft for 14015052 on the 15th April 2015, not in March as you say in … Continue reading

Posted in LGO, Misconduct | Leave a comment

UK Docks – Breach of Planning Permission

Not only has Condition 2 been breached but Condition 5 has been breached as well. 2. The development to which this permission relates shall be carried out in complete accordance with the approved plans and specifications. 5. No works, other … Continue reading

Posted in Planning, UK Docks | 1 Comment

No Action on Sunday Working

Council being evasive on Sunday working at UK Docks when it is simply a breach of planning permission. Conditions: the fifth is about permitted hours. Trail of obfuscation:  from 20-Dec-16 to 9-Jan-17.

Posted in Planning, UK Docks | Leave a comment

Rejoinder

UK Dock’s boatshed on River Drive is built somewhat bigger than planned and even South Tyneside Council admit it has been built without planning permission. They appear to be saying that it is only little bit wider but no taller … Continue reading

Posted in Planning, UK Docks | Leave a comment

Mcnulty’s comes down

Shields Gazette 16 Sept 2016 by Fiona Thompson Email: They once helped make the banks of the River Tyne a hive of industrial activity. Now, the sheds of McNulty Offshore are being pulled down as the next chapter in the … Continue reading

Posted in Uncategorized | Leave a comment

Closure of Tyne Dock

The bonfire of insanity: Woodland is shipped 3,800 miles and burned in Drax power station. It belches out more CO2 than coal at a huge cost YOU pay for… and all for a cleaner, greener Britain! Drax Power Station in … Continue reading

Posted in Port of Tyne | Leave a comment

Closure of Tyne Dock

Mcnultys no More Shields Gazette 16 Sept 2016 by Fiona Thompson Email They once helped make the banks of the River Tyne a hive of industrial activity. Now, the sheds of McNulty Offshore are being pulled down as the next … Continue reading

Posted in Port of Tyne | Leave a comment