Conflation of Complaints

From: mick.dawson@theharbourview.co.uk
Date: 23/12/2020 (15:47:11 BST)
To: Nicola Robason
Cc: Emma Lewell-Buck MP, Anne-marie Trevelyan MP, Cllr Angela Hamilton, Cllr David Francis,Peter Cunningham, George Mansbridge, Hayley Johnson, Alison Hoy, Garry Simmonette
1 Attachment: Conflation-23-Dec-20.pdf (505 KB)

Dear Nicola,

My email started to grow like Topsy when I started to look back at the number of times that my questions/complaints about the height of the shed were referred to Customer Advocacy and especially how many times the responses were accompanied by misrepresentations of various kinds.

I’d also started to reproduce quotes and photographs from the various items of correspondence to reduce the number of cross references so I’ve converted ‘Conflation of Complaints’ into a pdf document.

Please see the attached file.

Kind regards,
Mick Dawson

Posted in Uncategorized | Leave a comment

Corruption of Complaints Procedure

South Tyneside Council and the Local Government Ombudsman
From: mick.dawson@theharbourview.co.uk
Date: 18/12/2020 (11:51:49 BST)
To: Nicola Robason
Cc: Emma Lewell-Buck MP, Anne-marie Trevelyan MP, Cllr Angela Hamilton, Cllr David Francis, Peter Cunningham, George Mansbridge, Hayley Johnson, Alison Hoy, Garry Simmonette, Keith Palmer
1 Attachment: BCandSTCtoJR7-Dec-20.pdf (84 KB)

Dear Nicola

Conflation of Complaints.

I had become Resident’s spokesperson after the Town Hall meeting in November 2013 as I was the only person attending who spoke out against the proposition made by the Principal Planning Officer that the enclosure (shed) had been approved. To put it another way I saw straight through Cllr Anglin’s view of the meeting: “Michael, I took no minutes as is customary at these informal meetings. For your record I am sure all would agree: The Exec representatives of the Group accepted that the construction had been made legally as per drawings seen.
Not only had he downgraded a meeting that was to decide the future of the shed, he linked me to two people who had an interest in its survival. First of all, I was not an ‘Exec representative’ of the Tyne Gateway Assn (TGA) although I had been on its committee for a good number of years, and secondly, I was aware that to say that the structure had been made legally to mean it had been approved was probably a fraudulent misrepresentation and your interim Head of Legal Services should be able to confirm that for you.
Continue reading

Posted in Abuse of Complaints System, Corruption | 1 Comment

Building Control and South Tyneside Council

Building Control and South Tyneside Council
From: mick.dawson@theharbourview.co.uk
Date: 07/12/2020 (11:18:36 GMT)
To: John Rumney
Cc: Emma Lewell-Buck MP, Anne-marie Trevelyan MP,
Alison Hoy, Cllr Angela Hamilton, Cllr David Francis,
Peter Cunningham, George Mansbridge, Hayley Johnson,
Bcc: 20 or so

2 Attachments: CritiqueHJforCEO1Aug16.pdf (55 KB)
               BCandSTCtoJR7-Dec-20.pdf (82 KB)

Dear Mr Rumney,

Please see the attached: “CritiqueHJforCEO1Aug16” and “Building Control and South Tyneside Council” (BCandSTCtoJR7-Dec-20).
The copy of my letter, South Tyneside Council and the Local Government Ombudsman, sent last week has been relabelled: STCandLGO30-Nov-20 to avoid confusion. I’d forgotten I had used the title before and I apologise.
Continue reading

Posted in Abuse of Complaints System | Leave a comment

Dear All

South Tyneside Council and the Local Government Ombudsman
From: mick.dawson@theharbourview.co.uk
Date: 30/11/2020 (07:38:54 GMT)
To: Emma Lewell-Buck MP, Anne-Marie Trevelyan MP,
Cllr Angela Hamilton, Cllr David Francis,
Peter Cunningham, George Mansbridge,
Hayley Johnson, Alison Hoy, John Rumney
Bcc: 20 or so
1 Attachment STCandLGO30-Nov-20.pdf (117 KB)

Dear All,
I’ve made no secret of the fact that I believe that South Shields Council have been corrupting their complaints procedure and in turn that of the Local Government Ombudsman (Ombudsman) to hide the lack of building control amongst other things. It points to the reticence of their Chief Enforcement Officer to take any action against preferred developers who build what they want rather than what had been allowed.
Continue reading

Posted in Abuse of Complaints System, Corruption | 1 Comment

Commentary on FBR266872

Initiation.

Unfortunately the Council do not reproduce a complaint when they respond to it so they can say anything they like about it; when I commented on the application: ST/0461/14/FUL: Demolition of the existing single storey office block and workshop/winch house with additional office and storage accommodation on its roof. The existing buildings will be replaced with a new 2 storey office block, workshop with winch house and mezzanine floor to provide a staff canteen, managers office, kitchen and sanitary facilities, an extension to the existing boat shed, an additional boat shed (to match existing) and a new jetty. The existing vehicular access is to be relocated.

I failed to record but it was something like:

As the council have admitted on Nov 24th 2014 that the existing boat
shed has been built without planning permission it is nonsense for
the Agents for UK Docks, Gary Craig Building Services Ltd, make the 
application to extend it then replicate it.

It is not clear if the the additional shed was to be the same length as the existing shed or some 5.5m longer. The drawings were no help in this respect either as the original shed was drawn with the extra length but the clue to what was going on was that no heights were given to any building in the new scheme. The rest of is laid out in response/repost pairs with a commentary below each:

1st Response: From: Emma Anderson
Sent: Thursday, February 05, 2015 11:19 AM
To: mick.dawson@theharbourview.co.uk
Subject: RE FBR – 266782, Planning application ST/0461/14/FUL [NOT PROTECTIVELY MARKED]

Dear Mr Dawson
I am writing in regard to your recent feedback request 266782, and the planning application ST/0461/14/FUL.
I have spoken to our planning department and they have advised that past issues do not affect the validity of any new planning applications and as such it is going through the normal planning process. We would not ask that it be withdrawn.
If I can be of any further help please get in touch.
Kind Regards
Emma Anderson
Performance and Information Support Officer

Planning have been spinning a yarn to Emma. It appears that Gary Craig was complicit in trying to hide the fact that the original shed is too high, either that, or UK Docks had not told him that the original shed was too high. It is 2.7m taller than the authorised drawings from 1996 allow. If anyone tells you otherwise just point them in the direction of drawing 8296/2. He was also using foundations for a sixth frame laid in 2001 for which there was no permission. The important to note is that the complaint has been recognised and allocated a number:-

1st Repost: From: Mick Dawson
Sent: 27 February 2015 14:47
To: Gordon Atkinson
Cc: Emma Anderson
Subject: RE FBR – 266782, Planning application ST/0461/14/FUL [NOT PROTECTIVELY MARKED]

Dear Mr Atkinson,
I think Emma has been wrongly advised by your office in her reply to me. I wrote: “Planning Application ST/0461/14/FUL – to paraphrase: for new offices, an extension to the existing boat shed and an additional boat shed to match the existing one. As the council have admitted on Nov 24th 2014 that the existing boat shed has been built without planning permission it would make good sense to ask the Agents for UK Docks, Gary Craig Building Services Ltd, to withdraw the application to replicate it. Please explain why this has not been done”.
The important words here are “an additional boat shed to match the existing one” and it looks like Emma has not been informed or ignored the fact that the existing boat shed was built without planning permission. It would appear that whoever signed off the existing shed at the beginning of June was not working from approved plans or was turning a blind eye to the material divergence from the approved plan. Either way the application for the second shed is well out of order. It does not make any sense for this application to stand and even less sense for it to go forward to committee in its present state.
If you cannot agree with me then I am happy to treat your reply as a Stage 1 reply to a complaint and take it forward through the normal channels.
regards
Mick Dawson

I wrote to the Planning Manager and not Emma because her response had all the hallmarks of one of his replies. He knew it was too high as he had conceded the point in February 2014 but he had made his replies in such a way so that they could be taken out of context. The important bit is the point I raise about Building Control turning a blind eye to the fact that the shed is too wide and too high. Email from Customer Advocacy 24-Nov-14. Their is no mention of the height in her response of the 25th September.

2nd Response.

Notice he has concentrated the focus on the new shed and diverted attention from the the fact that existing shed is 3m higher than planned. The shed was 15.5m not the permitted 12.7m as shown by the drawing. Notice that Mr Atkinson has avoided saying that we were wrong about the height.

Subject: RE FBR – 266782, Planning application ST/0461/14/FUL [NOT PROTECTIVELY MARKED]
From: “Gordon Atkinson” <Gordon.Atkinson@southtyneside.gov.uk>
Date: Mon, March 2, 2015 4:31 pm
To: “Mick Dawson” <mick.dawson@theharbourview.co.uk>
Priority: Normal

Dear Mr Dawson
Emma was not wrongly advised by me when she replied to you.
The description on the current application of “an additional boat shed (to match existing)” is accurate, and the proposal is detailed in the submitted drawings. In your representations on the planning application you have made the point that the current slipway shed is considered by residents to have been built 3m higher than plans provided show. That observation will be reported when the application is considered by the Planning Committee.

Regards
Gordon Atkinson

2nd Repost. Subject: FBR – 266782, Planning application ST/0461/14/FUL [NOT PROTECTIVELY MARKED]
From: mick.dawson@theharbourview.co.uk
Date: Wed, March 4, 2015 9:30 am
To: “Gordon Atkinson” <Gordon.Atkinson@southtyneside.gov.uk>
Cc: “Customer Advocates” <Customer.Advocates@southtyneside.gov.uk>

Dear Mr Atkinson,

Thank you for your prompt reply. I still think Emma was wrongly advised.

Since the application ST/0461/14/FUL and our responses to it were received by your office, events have moved on and Customer Advocacy have agreed with me and said that the shed has been built without planning permission, please see attached. It occurs to me that you have not been told this.

I say again; it would appear that whoever signed off the existing shed at the beginning of June was not working from approved plans or was turning a blind eye to the material divergence from the approved plan. Either way the application for the second shed is well out of order. It does not make any sense for this application to stand and even less sense for it to go forward to committee in its present state.

It would appear that the normal complaints system has failed. My former neighbours and I are back where we were when I wrote to you a year ago and the main difference now is that we have a fully operational shipyard on our doorstep that has been built without planning permission. Where do we go from here? Perish the thought that I will be writing again to you on 4th March 2016 complaining about two unplanned slipway covers.
regards

Mick Dawson

The attached letter was the email from Customer Advocacy – the email of 24-Nov-14 see above. I go into more detail and remind him of some of the events leading up the the Council misleading the Local Government Ombudsman. He appears to have forgotten that he made 8296/2 available to us in January2014. I was my choice to use 8296/14 because he approved it October 2014 and it would have included any approved amendments and the height was not one of them. I personally think that he did not notice that the draftsman had included beams and pillars in the elevation. As soon as I used 8296/14 in my original complaint he would have known that the game was up. The elevation is drawn to a scale of 1:100 and is 16cm tall though that is not what the Council told the Ombudsman.

3rd Response.

Subject: FBR – 266782, Planning application ST/0461/14/FUL [NOT PROTECTIVELY MARKED]
From: “Gordon Atkinson” <Gordon.Atkinson@southtyneside.gov.uk>
Date: Wed, March 4, 2015 3:58 pm
To: “mick.dawson@theharbourview.co.uk” <mick.dawson@theharbourview.co.uk>
Cc: “Customer Advocates” <Customer.Advocates@southtyneside.gov.uk>

Dear Mr Dawson
It was not a case that Customer Advocacy have agreed with you and said that the shed
has been built without planning permission; what was said in Michaela Hamilton’s
email of 24/11 was that she was confirming, as previously advised, that the Council
accepts that the structure does not have planning permission; she also explained the
reasons for Mr Mansbridge’s (Head of Development Services) decision that it was not
expedient to take enforcement action.
Rather than it being a matter of me have not been told what the Customer Advocacy
told you, the decisions on the planning aspects of the case are matters for
Development Services and not for Customer Advocacy.

When we met on 8 July 2014, with Mr Mansbridge, we spent some time through the
approved drawings-the height annotated on 8296/1A are 15.5m at River Drive and
18.156 at the Riverside. We explained then that 8296/14 is of no relevance in that
matter (& in fact it was prepared after the steel frame had been erected).
You say that a fully operational shipyard on your doorstep has been built without
planning permission-that is not the case; the site’s use as a boat yard and slipway
has never been in doubt.
Regards
Gordon Atkinson

What is the difference between ‘the shed has been built without planning permission’ and ‘the Council accepts that the structure does not have planning permission’? His second paragraph makes no sense at all.

The meeting was arranged to view 8296/14 because it was relevant and I planned to show Mr Mansbridge that it had been approved by Mr Atkinson himself and showed that the planned height of the shed was 12.7 or 12.8m and not what the Council were saying (18.2m). One can now understand why the Planning Manager did not bring 8296/14 to the meeting; it would have shown him to be in the same league as the Directors of UK Docks and HB Hydraulics.

It was prepared in August 2013 and dated Aug 13. UK Docks started erecting the frame in September. The meeting was not arranged to view 8296/1A or 1B, both of which have been used to hide the truth about the height. His other lie concerns 8296/1A, which like 1B, was never approved, presumably because they also show the river end to have a height of 15.5m

3rd Repost.
Subject: Application ST/0461/14/FUL – 2nd Slipway Cover and Offices
From: “Mick Dawson” <mick.dawson@theharbourview.co.uk>
Date: Tue, March 10, 2015 11:55 am
To: “Gordon Atkinson” <gordon.atkinson@southtyneside.gov.uk>

Dear Mr Atkinson

Thank you for your reply. When I first raised this issue I wrote:-
“Planning Application ST/0461/14/FUL – to paraphrase: for new offices, an extension to the existing boat shed and an additional boat shed to match the existing one. As the council have admitted on Nov 24th 2014 that the existing boat shed has been built without planning permission it would make good sense to ask the Agents for UK Docks, Gary Craig Building Services Ltd, to withdraw the application to replicate it.” I will put it another way:
It would appear that whoever signed off the existing shed at the beginning of June was not working from approved plans or was turning a blind eye to the material divergence from the approved plan. Either way, it would appear that the structure is illegal and Mr Mansbridge’s (Head of Development Services) decision that it was not expedient to take enforcement action is questionable. It looks like his decision not to take action on the existing shed is the reason that Uk Docks have been able to submit an application to build another one without anyone in your office questioning whether it is appropriate.

I would leave it here but for the record I must take issue with a few points in your last email.

You wrote:

1) It was not a case that Customer Advocacy have agreed with you and said that the shed has been built without planning permission; what was said in Michaela Hamilton’s email of 24/11 was that she was confirming, as previously advised, that the Council accepts that the structure does not have planning permission; she also explained the reasons for Mr Mansbridge’s (Head of Development Services) decision that it was not expedient to take enforcement action.

I have looked again at what Michaela Hamilton was confirming and that was that the shed was built a meter wider than planned. There is no mention of height i.e. being built 3m higher than planned. Mr Mansbridge interpretation of the drawing 8296/1A, fifth paragraph in his letter to me 2nd June does not ring true. As I pointed out to you at the meeting held on 8th July the drawing shows a height of 15.5m at both ends. If you look again at the drawing you will see that the 12.5m height to the hip at the River Drive end is given incorrectly. It should by scaling be 9.75m giving a height of 12.75m and not as Mr Mansbridge says (15.5m).

2) Rather than it being a matter of me have not been told what the Customer Advocacy told you, the decisions on the planning aspects of the case are matters for Development Services and not for Customer Advocacy.

Customer Advocacy answered my letter to the CEO and hence they pull rank over the Head of Management Services although they can only work on what he leaves for them. The discrepancy between the planned height and the built height has been overlooked for example. He says in Para 4 “That would represent a significant deviation from the approved scheme” and then dismisses the height question altogether.

4) When we met on 8 July 2014, with Mr Mansbridge, we spent some time through the approved drawings-the height annotated on 8296/1A are 15.5m at River Drive and 18.156 at the Riverside. We explained then that 8296/14 is of no relevance in that matter (& in fact it was prepared after the steel frame had been erected).

Mr Mansbridge said (Para 6 of the same letter) that he would be more than happy to meet with me and show me the relevant plans and elevation(8296/14). I do not know if you had been instructed to bring these drawings to the meeting but they were not discussed. If the drawings had been shown I would have been able to illustrate how relevant they are. This was as shame as my partner and I had travelled all the way from Amble to discuss these drawings in particular. I had used the drawing 8296/14 to illustrate my point that the planned height at the River Drive end was 12.6m in my correspondence with you in Jan/Feb last year. It rather confirms my point about the indicated planned height on drawing 8296/1A. Do I have to go through this again to persuade Mr Mansbridge that he is wrong not to consider the deviation in height?

5)You say that a fully operational shipyard on your doorstep has been built without planning permission-that is not the case; the site’s use as a boat yard and slipway has never been in doubt.
Regards
Gordon Atkinson

It was a boatyard, it is now a shipyard. My and, I may be a bit presumptuous here, 300 others, opinion.

Regards
Mick Dawson

PS. yesterday I received the Ombudsman’s draft decision (summary below) and you will notice that the height of the shed is not mentioned. This may be something to do with originator of the complaint. It was raised by someone other than I and the finger points directly to Management Services:

Summary: This complaint is not upheld. In 2013 a developer resumed building a boat shed for which he had planning permission and had started building in 2001. Local residents complained but the Council found the developer could still build the shed. However, he had built it almost a metre wider than he should have done. There is no evidence of fault in the way the Council dealt with the breach of planning control and its decision not to take enforcement action. It kept residents informed throughout the process.

The first draft of the Ombudsman’s Findings was received by both the Council and I. One only has to scan it to see that like Customer Advocacy the authors had both avoided the question of height and the extra with was reduced to being a non-material consideration. The Head of Development Services the head said it was ‘material’ in his response to our Petition was actually one of the few things he got right.

4th Response.
Subject: RE: Application ST/0461/14/FUL – 2nd Slipway Cover and Offices [PROTECT]
From: “Customer Advocates” <Customer.Advocates@southtyneside.gov.uk>
Date: Thu, March 12, 2015 1:19 pm
To: “mick.dawson@theharbourview.co.uk” <mick.dawson@theharbourview.co.uk>

Dear Mr Dawson

Your email to Mr Atkinson has been forwarded to our team as your complaint on this matter has exhausted the Council’s complaints procedure and is now with the Local Government Ombudsman’s office.

We have received the Ombudsman’s draft decision on your complaint and if you feel there is anything you raised with the investigator which has not been addressed by them, you should contact them directly as the Ombudsman base their investigation on the issues you raise with their office. They have asked for any comments on the decision to reach them by 30 March 2015.

kind regards
Alison Hoy
Performance and Information Support Officer
Customer Advocates Team

The first thing to notice is that Alison has marked her response as [PROTECT] and the other is that there is no longer any link to 266782, it might have been my mistake to drop the reference number from the title but Mr Atkinson had clearly taken the opportunity to pedal two more lies about the drawings and to use Alison to make this possible:

1. That the meeting of 8-July was about 8296/1A – it was not, it was about 8296/14*;
2. 8296/14 was drawn after the frames went up in September 2013 – it is dated Aug 13.

to some of the ones he has already made:
• that 8296/1A was approved;
• that the gable end on 8296/14 referred to the road end;
• the gable end was was not drawn to scale;

The complaint that it was unreasonable to accept a planning application to extend a building that had been built without planning permission has disappeared and again he has used Alison to assist.

* The email about the meeting was sent to the Head of Development Services and copied to Customer Advocacy. It stated very clearly the truth about the height and she did not incorporate into her investigation.

Posted in Abuse of Complaints System, Misconduct, Misinformation/Misrepresentation | Leave a comment

Dissection of Response to Petition

Dissection of Response to Petition moved to a Page in Slipway Shed

Resident Date: 2nd May 2014
Greens Place & Harbour View Our Ref: GM/LB
South Shields Your Ref:
Tyne and Wear NE33 2A?

Dear Resident

Development at UK Docks Ltd, Tyne Slipway, River Drive, South Shields

I am sending this letter to all households in Harbour View, and households between 32 and 99 Greens Place to explain the outcome of the Council’s investigations into the recent developments at the Tyne Slipway in River Drive.

I have endeavoured to answer all the various questions that have been raised with the Council in recent months, including in a petition which many local residents have signed.

He generally answered the questions with misrepresentations.

There was actually no need for a Second Stage complaint as the Planning Manager had conceded that the shed was nearly 3m taller than planned. It appears that following my email, on behalf of the residents, to the Planning Manager, 3-Mar-14, the Council changed their story from the shed had been approved to one that the variations were only minor. They were not, and they were covering for the negligence of their building control inspectors by lying over the phone to enquirers. Was there anything in writing until this response to our Petition? I doubt it.

Posted in Abuse of Complaints System, Corruption | Leave a comment

Who was Keith Palmer?

Who was Keith Palmer?
From: Michael Dawson
Date: 23/10/2020 (11:58:37 GMT)
To: Emma Lewell-Buck
Cc: Angela Hamilton

Dear Emma,

On January 8th I received an email from Simon Buck:

Good morning Mr Dawson,
I wonder if it is possible to have your telephone number, I will then pass this on to my colleague Keith Palmer who will call you later today.
Kind regards.

Simon Buck
Office Manager for the
Office of Emma Lewell-Buck MP.

After a bit of thought I responded, 9th Jan, gave him my home phone number and said:

Dear Simon,
Sorry, I do not look in my mail every day and it may be better to use my personal email box daw50nmdj@hotmail.co.uk unless Keith wants to talk about corruption at the Town Hall, UK Docks etc.

Lunchtime, Monday 13th I noticed I had missed a call from your office on Westoe Road and was happy to return it [0191 427 1240]  but realised immediately that that Mr Palmer was only interested in closing down all dialogues concerning UK Dock and corruption.
He had therefore got my home number under false pretences and as you can see, and I thought I would put you in the picture that evening:

Dear Emma,
I answered a call today from a Mr Keith Palmer on 01914271240 and we spoke about UK Docks. Judging from the email address he gave me, I guess he must be your office manager in South Shields and from our conversation I gathered he did not wish to consider any further correspondence from me and suggested that because I now lived away you/he would not be able to deal with correspondence because of parliamentary rules. You and I both know this to be nonsense as the shed is on your patch.
He hinted at, expensive litigation, vexatious complaints and presenting new evidence to the LGO which shows he has been warned off helping me by an official at the Town Hall which in turn goes back to the attempt by the CLP to deselect you.
What I really needed from you was your support and Mr Palmer has indicated by our exchange over the phone that he is not prepared to give it. At the end of the day the Council are misusing the Ombudsman's Office to hide malpractice then use their findings to deflect any enquirers after the truth.
I understood from Mr Palmer that this was no longer a matter for Parliament but I think it is. Only Parliament can make it a criminal offence to lie to the Ombudsman. I have attached a copy of the letter from my Solicitor for Mr Palmer's perusal and he would do well to read the email to Customer Advocacy 03 September 2016 at the foot of the trail below. Incidentally it was passed back to Mrs Johnson and was not dealt with by Customer Advocacy. If it still exists it is lying unattended on a file.
In future, shall I just copy Mr Palmer any correspondence about UK Docks so he can place it in the file for reference?
Kind regards
Michael

It looks as if though this email was deleted without you ever seeing it as Mr Buck responded to the one below.
Logic does not appear be Mr Palmer’s strongest suit. I write to you twice and get a response from Mr Buck referring to a phone call – see attached dissection. What gave the pair of them away was that I had copied my email to Mr Palmer not to Mr Buck and yet it was Mr Buck who replied.
I have reattached the letter from Mr Tilbury and I suggest that you ask Mr Buck to read it. I have also attached a criticism of his empty threat of the 26th Feb and until I get apology from him, I will not let the matter rest. Mr Palmer is careful not to put anything in writing so I would not expect one from him.
I know you have more pressing business in Parliament, and it is a shame that you and your fellow MP’s (Bradford West and another, I did not catch the name of her seat) pleas for free meals fell on deaf ears but there is another issue which should be addressed and I will write separately about that.
For the near future, I will just keep you and Angela informed by putting you in the Bccs along with the other protestors like Julie, Melanie and Paul. At the end of the day Council’s like South Shields will continue to abuse the office of the Local Government Ombudsman until something is done about it and it looks like we will have to wait for Parliament to collapse or Dominic Cumming be deposed before there is any chance of that happening.
I notice from Nicola Robason and Stuart Reid’s letter to Cllr Malcolm that bullying is rife in South Shields Council and I suspect Mr Palmer’s actions are not unconnected. By the way who was Mr Palmer working for?

Kind regards,
Mick Dawson

----- Forwarded message from mick.dawson@theharbourview.co.uk -----
Date: Tue, 14 Jan 2020 07:37:08 +0000
From: mick.dawson@theharbourview.co.uk
Subject: Fwd: Automatic reply: Complaint: 248789 - Unplanned
Development on River Drive
To: Emma Lewell-Buck MP 
Cc: Keith Palmer, Nicola Robason, Mike Harding,  palmerk@parliament.co.uk


Dear Emma,
I gave my phone details to you partner to pass to a Mr Keith Parmer,
he has them and I spoke to him yesterday on 0191 4271240.
Is it safe to assume he is your Office Manager in South Shields and we should write to him on any issues we have with UK Docks?
The case ZA4803, please see attached, and it has been with you for many years although it was passed to Anne Marie Trevelyan MP while I was lodging at 5 Second Avenue, Amble.
70 Greens Place was on the market for about 4 years and I did not sell it until 2019.
I was resident back there when UK Docks extended their shed in August 2017. I complained to you about the conduct of Councillor Anglin at that time and you suggested that I take it up with the Monitoring Officer, Mike Harding, and although I have not raised that issue with him I have discovered that he does not even acknowledge the receipt of any letters or emails let alone go any way to resolving any of the issues raised. 
I discovered this when I tried to raise a similar complaint with him at the back end of 2018.
Nicola Robeson does respond and she has confirmed that UK Docks were not given permission for their shed retrospectively which makes one wonder why they told you and Angela that they had.

Yours sincerely
Michael Dawson
Posted in Corruption, Misconduct | Leave a comment

a Busy Morning, 26-Feb

I did not spot it at the time but I had written to the Office Manager of the MP for South Shields on the 24th February  explaining how and why the Head of Development Services had overwritten ‘the complaint‘ with one of his own so he could reintroduce unauthorised faulty drawings to replace the faultless approved ones.
The unauthorised faulty drawings were needed to con the Local Government Ombudsman into finding for the Council and UK Docks rather than the local residents.
Mr Palmer had conned me into thinking he was the MP’s new Office Manager. I’ve asked him who he is, officially speaking, but he declines to answer. All I know is that he is a colleague of the MP’s Office Manager.
Continue reading

Posted in Abuse of Complaints System, Misconduct | 1 Comment

misinformation-or-misrepresentation

The first reference in the signed letter to Mr Harding, Head of Legal Services, 19th July 2019 pointed to a deleted post and it has now been reinstated to point correctly to a copy of the letter to him of April 9th 2019 which he did not even acknowledge. As it was not registered, this is the nearest thing I can do to prove of its existence. He no longer works for the Council.

A safer copy of the attached letter of the 19th July can be viewed in copy of the the email below.

South Tyneside Council and the Local Government Ombudsman.
From: mick.dawson@theharbourview.co.uk
Date: 19/06/2019 (21:08:05 BST)
To: Mike Harding
Cc:
Andrew Tilbury (Solicitor, Peter Dunn & Co)
Alison Hoy (Customer Advocates)
Gill Hayton (Solicitor STC)
Cllr Angela Hamilton, Cllr David Francis, Cllr Anglin,
MP Emma Lewell-Buck, MP Stephen Hepburn
Chair TGA – Graeme Watson
STC – George Mansbridge, Peter Cunningham, Garry Simmonette

Attachment: DearMH19-June-19.pdf

Dear Mr Harding and Everybody,

Please see attached signed letter. It should be self explanatory. I knew from complaining about 71 Greens Place that the Council were misusing their complaints procedure and using the Ombudsman as a hidden fourth stage of it to hide malpractice, bad planning decisions etc. and it was clear from the start that that they were going to do the same thing with UK Docks shed.

If the Planning Officer who measured the shed had any evidence to support his view that the shed was approved we would have seen it long before we even considered resurrecting the Tyne Gateway Assn and certainly before the charade of the Town Hall meeting in November 2013.

It should of dawned on me before Alison’s email of 9-Dec-15 that they would use the Ombudsman’s findings to misinform other Residents, Councillors, MPs, Newspapers etc. but there you go, one does not expect people to lie to the Ombudsman.

Regards,
Michael Dawson

Nor to their Monitoring Officer either.
Posted in Abuse of Complaints System, Corruption | Leave a comment

Denial by Monitoring Officer

Fwd: Complaint: 248789 – Unplanned Development on River Drive
From: mick.dawson@theharbourview.co.uk
Date: 22/07/2020 (12:33:34 BST)
To: Nicola Robason
Cc: Cllr Angela Hamilton, Cllr David Francis, Emma Lewell-Buck MP, Keith Palmer, Customer Advocates, Hayley Johnson, Simon Buck, Anne-Marie Trevelyan MP
Bcc: 20+ local residents

2 Attachments

Simon Buck Threat 26-Feb-20.pdf (95 KB)A observation of the misuse of a Parliamentary Code.
LettertoHJ-02Sep16.pdf (92 KB)A criticism of the second hatchet job by Hayley Johnson. Needless to say, she ignored it but the main thing was her switch from complaint 248789 to 253539. The later number was invented by the Head of Development Services to hide the corruption of the complaints procedure by him and his staff else they would not have been able to take the complaint to the fourth stage, the Ombudsman. There were two emails following the one of the 4th April. None of the questions raised in any of them was addressed by Mr Mansbridge:

  1. 4-Apr-14, Continuing to use the shed;
  2. 2-May-14, Misuse of the Complaints Procedure by Planning Staff;
  3. 9-May-14, Request a correction to the response to our Petition.

Dear Nicola,
Continue reading

Posted in Procedure | Leave a comment